Events Calendar

Module 5 – Compliance with GMP for the Pharmaceutical Engineer (23 – 25 July 2018) – 3 day Course
From Monday 23 July 2018 -  08:00am
To Wednesday 25 July 2018 - 05:00pm
Hits : 617
by This email address is being protected from spambots. You need JavaScript enabled to view it.

Aim: To provide an introduction to the requirements of Good Manufacturing Practices for supporting design of facilities,equipment and processes in the pharmaceutical and related industries, and to develop a broad understanding of the scope of Good Engineering Practices and Good Manufacturing Practices.


Day 1       AM Facility Layout and Design Principles

PM Design and Construction of Critical Utilities: inc. Water, Gases and Steam

Day 2       AM Water Systems: Design, Control & Validation

PM HVAC Design, Control & Validation

Day 3       AM Qualification of Processing Equipment

PM Planned Preventative Maintenance and Calibration

National Pharmaceutical Regulatory Agency (NPRA)
Lot 36, Jalan Universiti, 46200 Petaling Jaya, Selangor, Malaysia.
  • Email: npra@npra.gov.my
  • Phone: +603-7883 5400
  • Fax: +603-7956 2924, +603-7956 7075

DISCLAIMER

The Government of Malaysia and the National Pharmaceutical Regulatory Agency are not responsible for any loss or damage caused by the usage of any information obtained from this website.

Mobile Web :

Newsletter Subsription

Site Last Modified

  • Last Modified: Friday 19 October 2018, 16:57:45.
© Copyright 2018 . All Rights Reserved National Pharmaceutical Regulatory Agency NPRA